Project Name
NSS IT – KTM Station
Location
Various of KTMB Station
Developer
KTM Berhad
Status
Completed in 2022
What We Do

Full supervision to access of the construction area of manpower, full time site supervisor/engineer for the design, preparation and handover. Supply installation and material to hack and conceal underfloor trunking for looping. All the cg box, vga cable, series cable and loose short cat cable supply by others and includes the testing and commissioning. Installation works, did endorse PE, to design and we do provided a full site visit for KTMB station.